Users who have operated the Vickers vane pump know that when the Vickers vane pump is used, it has different fittings to be installed, but not all of the fittings can be installed. Today A&S Hydraulic Parts Co., Ltd w.Sales department installation engineer Kirk came to tell you about the installation of Vickers vane pump accessories.

 Users who have operated the Vickers vane pump know that when the Vickers vane pump is used

1. The Vickers vane pump auxiliary device must meet the requirements in the design drawings. In order to indicate when various types of filters need to be cleaned and replaced, a contamination indicator or test device must be installed.

2. The installation height of the level gauge and thermometer (or the liquid level thermometer of the two) set on the side plate of the Vickers vane pump tank shall comply with the provisions in the design drawings.

3.The position of the heater must be less than 0. 7W/cm2. The surface of the heater should not exceed 0. 7W/cm2.

4. The use of heat exchangers, there should be hydraulic oil (liquid) and cooling (or heating) medium temperature measurement point, but the heater installation position and the cooler return port must be away from the temperature measurement point. When using an air cooler, prevent the intake and exhaust passages from being blocked or blocked.